Confirmations are used to document the processing of orders or
operations such as production quantities, durations and activities. Data
specified in a confirmation would be as follows:
§
The quantity in an operation that was produced as yield, scrap; issued
as components and returned as un-used materials.
§
How much work was actually done?
§
Resources used for the operation/phase.
The following business transactions can be executed via confirmations:
§
Updating order data (for example, quantities, activities, dates,
status).
§
Automatic goods receipt (for one operation per order max.).
§
Reduction of the reserved capacity for the resources.
§
Updating costs based on confirmed data.
§
Updating MRP-relevant excess or missing quantities in the order.
At MYCOMPANY, confirmations would have to be carried out for each phase.
For example, if we consider Tablet Manufacturing process, there would be one
operation in the recipe called Tablet Manufacturing. However, this operation could
be further divided into three phases i.e. Granulation, Compression and
Coating. Each phase of the process order
would have to be confirmed individually, so that the yield and order status can
be tracked at shop floor level.
It is possible that the confirmations which were made were incorrect and
the user wants to reverse/cancel confirmation. So the system will allow the
user to cancel the confirmation.
Confirmations (to-be process)
Process
|
Description
|
Process owner
|
Triggering event
|
Process Order Confirmations
|
Confirmation is a process where
the shift in-charge enters the date of manufacturing, start time, end time of
production and actual weight/yield obtained in a process run.
|
Shop floor in-charge
|
Routine business activity
required to be performed every time a production process has been completed.
|
The Flow of the (to-be) process for Confirmations is as shown below:
Goods Receipt
At MYCOMPANY, once an order has finished execution i.e. it has been
confirmed, it is sent to the quarantine storage location for Quality control
processes. At MYCOMPANY, for bulk materials i.e. semi-finished materials, the
goods receipt process could be Automatic. However, in the packaging area, since
pallets are transferred to the warehouse even without the full completion of
the batch, therefore, Goods receipt would be carried out manually by the shift
in-charge/supervisor.
Process
|
Description
|
Process owner
|
Triggering event
|
Goods receipt
|
In this activity, the shift in
charge would post goods receipt against the process order by entering the
quantity (yield) of the material produced and its date of production (date of
manufacturing).
|
Shift in-charge
|
It is a post confirmation
process.
|
Quality Control
At MYCOMPANY, after goods receipt a quality inspection lot would be
generated. QC would then perform all the necessary tests, would record the
results and would take the usage decision. If QC approves, the goods would move to the
unrestricted stock, otherwise QC would check the possibility of re-processing
(semi-finished/bulk only). If the possibility for re-processing existed, QC
would create a onetime recipe and BOM for the reprocessing order. If
reprocessing were not possible, QC would pass on the batch for destruction.